Multiple chilling units were replaced on the 31st floor of the El Paso Energy Corporation building in downtown Houston. Installation of the new equipment on Level 31 required installation of a temporary lifting crane on the roof to lift component parts up to the installation level. Handling and hoisting of the components was a feat unto itself. RLB was responsible for the chill packages, refrigerant and oil, controls and connections, starters and disconnects, variable frequency drives and also was on site during installation.
El Paso Building Chiller Change Out - Downtown Houston